ISO 22468 · Lean Manufacturing & Operational Excellence

Value stream mapping,engineered for speed.

Replace fragmented Visio drawings, desktop statistical suites, and manual spreadsheets. Map ISO 22468 value streams, balance Yamazumi & Pareto, run 1,000 Monte-Carlo simulations, size Kanban loops, and execute FMEA, SMED, 5S, and A3 in one workspace.

Quick scenarios:
ISO 22468 Live Blueprint — 18,000 bph PET Line
Open Studio
Lead Time: 8.4 d · PCE: 0.68% · Bottleneck: FillingTakt = 8.4 s · 3 shifts · 9,600 packs/d
SUPPLIER (PET)2x / weekPRODUCTION CONTROL / ERPWeekly MRP PushCUSTOMER FMCG9,600/d · Takt 8.4sI2.8d1. Blow MoldingC/T: 6.2sC/O: 45mPush FlowOK2.8dVA 6.2sI2.1d2. Filling & CapC/T: 8.6sC/O: 65mPush FlowOVER TAKT2.1dVA 8.6sI1.8d3. LabelingC/T: 6.4sC/O: 15mPush FlowOK1.8dVA 6.4sI1.7d4. PalletizingC/T: 5.5sC/O: 10mPush FlowOK1.7dVA 5.5s

Every paid Lean tool.Unified in one workspace.

Everything offered separately by eVSM, Minitab Workspace, EngineRoom, KaiNexus, and Rever—engineered to run faster in your browser.

ISO 22468 Canvas

Reactive Vector VSM & Sawtooth Ladder

Automatic supplier-to-customer mapping with electronic ERP arrows, Supermarkets, Push/Pull/FIFO flows, Kaizen starbursts, and real-time Takt, PCE, RTY, and WIP cash.

Yamazumi & Pareto

Bottleneck Balancing & 80/20 Loss Pareto

Visualize station VA vs. downtime and quality losses against Customer Takt, and rank operational losses with an automatic 80/20 Pareto curve.

Monte-Carlo & Pull

Stochastic Simulation & Kanban Sizing

Run 1,000 Monte-Carlo variability trials in milliseconds, measure P90 delivery risk, test live What-If sliders, and calculate exact Kanban cards and Heijunka pitch.

Full OpEx & Excel

SIPOC, Ishikawa, FMEA, SMED, 5S & A3

Execute end-to-end root-cause analysis, SMED Internal-to-External conversions, 5S Gemba audits, A3 one-pagers, and multi-sheet Excel (.xlsx) import/export.

Built to outperformevery legacy OpEx suite.

Direct capability comparison against paid market leaders across VSM, statistics, shop-floor execution, and data portability.

Module / CapabilityVSME.neteVSMMinitab Workspace / EngageEngineRoomKaiNexus / ReverLucidchart / Miro
Auto ISO 22468 VSM + Sawtooth LadderInstant native SVGVisio / rigid webManual / semi-autoBasic templatesNot includedManual drawing
Live Lean Math (Takt, PCE, RTY, WIP Capital)Real-time reactiveFull (spreadsheet)Full (desktop)Table-linkedROI tracking onlyNone
Yamazumi Chart + 80/20 Loss ParetoIntegrated livePartialSeparate chartsIncludedManual uploadNone
1,000-Run Monte-Carlo & What-If SimulatorInstant in-browserStatic modelDesktop moduleMonte-Carlo onlyNoneNone
Kanban, Supermarket & Heijunka CalculatorAutomatic nativeIncludedPartialNoneNoneNone
OpEx Suite (SIPOC, 6M Fishbone, 5 Whys, FMEA, SMED, 5S, A3)All 6 synced to VSMVSM onlySeparate forms80+ disconnected toolsA3 / 5S checklistsStatic shapes
Green VSM (kWh/u & kg CO₂e/u) Native LayerIncluded freePaid add-onNoneNoneCustom fieldsNone
Multi-Sheet Excel (.xlsx) & Paste Sync4-sheet XLSX + PasteExcel VBA couplingDesktop importCSV / copy-pasteCSV exportPaid enterprise tier
Access & Licensing100% Free — All ModulesPaid annual licensePaid desktop seatPaid subscriptionEnterprise contractPaid per user
Working Capital & Carbon

Working capital unlocked, calculated in seconds.

Model the financial and carbon impact of converting Push queues into Kanban Pull supermarkets and SMED changeovers.

Average WIP inventory value per line€120,000
Current Lead Time (days)12.0 d
Number of value streams3
Working Capital Freed
€223,200
Projected Annual OpEx Savings
€170,400
Target Future Lead Time
3.72 d
Annual CO₂e Avoided
-128 t CO₂e
Model your stream in Studio

1,080 exact blueprints.Across 15 sectors & 90 sub-sectors.

Launch immediately and 100% free with calibrated ISO 22468 Value Stream maps across manufacturing, pharma, logistics, healthcare, finance, software, energy, and construction.

BIW Stamping & Electromechanical5 steps

Automotive Electromechanical Assembly

Stamping press, robotic welding, e-coat surface treatment, final assembly cell, and end-of-line test bench.

Takt: 59 sPCE: 0.046%
Open blueprint
5-Axis Aerospace Machining & NDT5 steps

Aerospace 5-Axis CNC & NDT Inspection

Titanium billet sawing, stress-relief mill, 5-axis CNC bottleneck, heat treat, FPI penetrant NDT, and CMM certification.

Takt: 22.5 minPCE: 0.78%
Open blueprint
Sheet Metal, Laser & Powder Coat5 steps

Sheet Metal Laser, Bending & Powder Coat

Fiber laser nesting cut, deburring, CNC press-brake bending + MIG welding bottleneck, powder coating cure, and hardware assembly.

Takt: 2.0 minPCE: 0.098%
Open blueprint
PCB SMT & Box-Build EMS5 steps

PCB SMT Pick-and-Place & Box Build

Solder paste stencil printing, high-speed SMD pick-and-place + reflow bottleneck, 3D AOI inspection, selective wave, and ICT box-build.

Takt: 23 sPCE: 0.022%
Open blueprint
Sterile Injectable & Aseptic GMP5 steps

Sterile Vial Fill-Finish & QC Release

Cleanroom Grade-A compounding, aseptic vial filling & lyophilization bottleneck, optical QC, FMD serialization, and QP release.

Takt: 4.5 sPCE: 0.003%
Open blueprint
Bottling, Canning & Beverages5 steps

18,000 bph PET Bottling Line

High-speed beverage line from preform blow molding through aseptic filling bottleneck, labeling, shrink-wrapping, and palletizing.

Takt: 8.4 sPCE: 0.005%
Open blueprint
Dairy, UHT & Plant-Based Alt5 steps

UHT Aseptic Dairy Processing & Filling

Raw milk standardization, homogenization, UHT thermal sterilization + CIP cycle bottleneck, aseptic brick filling, and cold-room palletizing.

Takt: 6.8 sPCE: 0.007%
Open blueprint
Plastic Injection & Extrusion5 steps

250T Plastic Injection & Assembly

Resin drying, 250T molding with high mold changeover (SMED target), vision QC, insert assembly, and packing.

Takt: 19 sPCE: 0.010%
Open blueprint
Paints, Coatings & Batch Chemicals5 steps

Specialty Coatings Batch Mixing & Fill

Powder dispersion, high-shear reactor mixing, lab shade/viscosity QC bottleneck, fine filtration, and automated drum filling.

Takt: 90 sPCE: 0.072%
Open blueprint
Apparel Cut-Make-Trim & Footwear5 steps

Apparel Cut-Make-Trim (CMT) Garment Line

Fabric spreading & automatic Gerber cutting, progressive bundle sewing bottleneck, washing/pressing, and AQL garment packing.

Takt: 36 sPCE: 0.028%
Open blueprint
Furniture, Millwork & Joinery5 steps

Modular Cabinetry & Millwork Line

CNC panel sizing, PUR edge banding, UV lacquer curing bottleneck, dowel boring, and flat-pack retail crating.

Takt: 90 sPCE: 0.16%
Open blueprint
E-Commerce Fulfillment & 3PL Hubs5 steps

E-Commerce Fulfillment Hub

Dock receiving, WMS putaway, wave picking bottleneck, packing & weigh-check, and express carrier dispatch.

Takt: 30 sPCE: 0.038%
Open blueprint
1,080 / 1,080 templates · Page 1 / 90
100% Free Studio · 1 Free Daily AI Credit

Design from scratch & 1,080 blueprints free.Plus 1 free AI generation every day with your account.

Build ISO 22468 Value Streams manually or launch from 1,080 exact industry blueprints with zero paywall. Sign in with Google or Email to receive 1 free AI credit every day.

  • Blank From-Scratch VSM Canvas & Drag-and-Drop Shapes (100% Free)
  • 1,080 exact industry templates — 15 sectors, 90 sub-sectors (Free)
  • Yamazumi Balancing, 80/20 Pareto, 1,000-Run Monte-Carlo & Kanban (Free)
  • Full OpEx Suite: SIPOC, 6M Fishbone, FMEA, SMED, 5S & A3 (Free)
  • 4-Sheet Excel (.xlsx), Vector SVG, HD PNG & A3 PDF Exports (Free)
  • AI Synthesis: 1 free AI credit every day (1 credit = 1 generation)

Frequently asked questions

Creating a VSM from scratch with drag-and-drop shapes, browsing all 1,080 industry templates, Yamazumi, Pareto, Monte-Carlo, Kanban, SIPOC, Ishikawa, FMEA, SMED, 5S, A3 reports, and Excel/SVG/PNG/PDF exports are 100% Free Forever without an account. To generate bespoke Value Streams via AI, sign in with a free Google or Email account and receive 1 free AI credit every day (1 credit = 1 generation). Need more? Purchase a non-expiring 10 AI Credits pack for $5 USD via PayPal.